PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized dampers at the 1st floor Facing West.jpg 4th floor copper piping Facing North.jpg Block work at Corridor 175 B Facing North-East.jpg Constructing the parapet along the high roof East Elevation.jpg Installed VAV boxes at the 1st floor Facing North.jpg Installing chair carriers at 2nd floor bathroom 227-228 Facing West.jpg Installing motorized dampers at the 1st floor Facing South.jpg
Previous pageNext page Block work at Corridor 175 B Facing North-East
Block work at Corridor 175 B Facing North-East